Free practical guide

    Road and Civil Works Takeoff: Paved Areas, Channels, Sewers and Manholes from the Site Plan

    Take paved areas, channels, sewers, manholes and trees off the site plan, keep new work apart from existing features and take the quantities over as an Excel list.

    David Plaseller
    David Plaseller4 min read

    A road and civil works takeoff starts on the site plan: how much asphalt and how much paving, how many metres of channel and sewer, how many manholes and house connections? Site plans show new work and existing features on top of each other, and taking quantities off by hand means keeping the two apart. PlanReader takes this groundwork off your hands: you upload the site plan as PDF and get the planned areas, lengths and counts marked on the plan and as an Excel list.

    Test one plan for free
    Road and Civil Works Takeoff: Paved Areas, Channels, Sewers and Manholes from the Site Plan

    Quantities from the site plan: an example

    An example: a residential street, 120 m long, with carriageway, a footway on one side, parking bays and a new foul sewer. The site plan gives these quantities:

    • Carriageway, asphalt: 120.00 m × 5.50 m = 660.00 m²
    • Footway, concrete block paving: 120.00 m × 2.00 m = 240.00 m²
    • Parking bays, grass pavers: 10 × 2.50 m × 5.00 m = 125.00 m²
    • Drainage channels on both sides of the carriageway: 2 × 120.00 m = 240.00 m
    • Sewer DN 250: 120.00 m, with 4 manholes and 12 house connections
    • Trees: 8

    Areas go into the quantity by surface type, channels and pipes by length, manholes, house connections and trees by number. One street is quick to calculate; a development with several streets and side areas is not. That is where PlanReader comes in.

    What PlanReader takes off the site plan

    You upload the site plan as PDF and choose the “Road and civil works” template or describe in your own words what you need. PlanReader captures only new work, not existing features:

    • Road and paved areas: separated by surface, each with its area.
    • Strips and channels, sewers and pipes: each with its length.
    • Parking bays and parking markings, house connections, manholes and trees: captured and marked on the plan.

    Whether you need only the paved areas, only the sewer or the whole plan is up to you.

    New work and existing features kept apart

    Site plans usually show both: what is to be built and what is already there. PlanReader captures only the new work. Every area, every pipe and every manhole is drawn on the original PDF, so your team sees at a glance what goes into the quantity. Whatever you see differently, you change directly on the plan: adjust, add or delete. The Excel export picks up every change.

    What the site plan does not show

    The site plan gives areas, lengths and counts. For the pavement layers, thicknesses and widths come from the typical cross-section, for example for the capping layer, sub-base and surface course. Sewer and manhole depths are on the longitudinal section. For earthworks, the site plan gives the areas and the cross-sections give the depths: area times depth is the volume. You add these figures from the respective drawings.

    How road and civil works are measured: the rules in brief

    Measurement rules differ from country to country, and the bill of quantities or the contract says which ones apply. In the UK, the RICS New Rules of Measurement (NRM 2) cover external works around buildings in work sections 35 “Site works”, 34 “Drainage below ground” and 5 “Excavating and filling”; civil engineering contracts have a method of their own, the CESMM4. Under NRM 2:

    • Pavings: by area in contact with the base, separated by type. Voids up to 1 m² are not deducted; strips up to 300 mm wide are measured by length.
    • Kerbs, edgings and channels: by length.
    • Drain runs: by length between the outer faces of the manholes, with pipe type, nominal diameter and average trench depth stated.
    • Manholes and gullies: by number, manholes with their depth from cover to invert.
    • Excavation: by volume as the drawings show it, with no allowance for bulking or working space.

    PlanReader delivers the quantities as the plan shows them, and you decide under your contract how they go into the bill.

    How it works

    • 1. Upload the site plan: upload the road site plan as PDF and set the scale on the plan.
    • 2. Choose the template: “Road and civil works” or a job of your own, for example “paved areas by surface and channels only”.
    • 3. Check on the plan: every quantity is drawn on. Your team checks, adds and corrects.
    • 4. Take over the Excel: the takeoff goes straight into your estimate.

    PlanReader does the groundwork; checking and approval stay with your team.

    Frequently asked questions

    How is paving measured?

    By area, separated by type of surface; kerbs, edgings and channels by length. Under NRM 2, the area is the one in contact with the base and voids up to 1 m² are not deducted. Your bill of quantities decides the details.

    Does PlanReader capture existing features too?

    No. With the “Road and civil works” template, PlanReader captures only the new work, so no existing features slip into the quantity.

    Which drawings do I need?

    The road site plan as PDF. You set the scale on the plan. Layer thicknesses and sewer and manhole depths come from the typical cross-section and the longitudinal section.

    Quantity takeoff by trade

    More articles in this series:

    All features at a glance: quantity takeoff from PDF drawings with PlanReader.

    ← Back to overview